PDN_-25 (Large)

Arts Festival Plaza

PDN_-25 (Large)

Project Description

Client:   City of El Paso – Capital Improvements Department
Location:   Downtown El Paso
Surface Area: 800 cubic yards
Year Completed:   2014

Different phases of project consisted of over 800 cubic yards of integral colored concrete using a 3600 PSI and TxDOT Class P mix with the City of El Paso.

Scope of Work

Project consisted of a new pedestrian pathway at the downtown Arts Plaza. Project consisted of removing the existing asphalt pavement, decorative brick pavers, planters, landscape and other amenities. The improvements included but were not limited to new decorative concrete pavement, repair of brick pavers, refurbishing of existing water feature, planters, landscape & irrigation, lighting and amenities.
Original Contract Time: 200 calendar days (7 months)
Completion Time: 7 months (on time)

Major Subcontractors/Suppliers: Code Electric, Prime Irrigation & Landscape, Steel Specialties, Paso Del Norte Materials.

PDN_-19 (Large)

Pedestrian Pathway Improvements Phase 1.2 A

PDN_-3 (Medium)

Project Description

Client:   City of El Paso – Capital Improvements Department
Location:   Mountain View CA 94043
Surface Area: 450,000 m2
Year Completed:   2014
Value: $2,238,649.87

Project consisted of a new pedestrian pathway at the downtown chamber of commerce parking lot on the Santa Fe street side. Project consisted of removing the existing asphalt pavement and landscaping, new decorative sidewalks, amphitheater type stairs, new landscape & irrigation, new lighting, electrical room.

More Details

Underground utilities & foundation of art piece. 
Original Contract Time: 15 months Completion Time: 14 months (ahead of time)
Major Subcontractors/Suppliers: Code Electric, Prime Irrigation & Landscape, Steel Specialties, EP Bestway Construction, Centeno Construction, Paso Del Norte Materials.
PDN_-9 (Large)

Pedestrian Pathway Improvements Phase 1.2B

PDN_-21 (Medium)
PDN_-9 (Large)

Project Description

Client:   City of El Paso – Capital Improvements Department
Location:   Downtown El Paso
Surface Area:
Year Completed:   2014

Project consisted of the second phase of a new pedestrian pathway at the downtown chamber of commerce parking lot on the Durango street side.

More Details

Project consisted of removing the existing asphalt pavement and landscaping, new decorative sidewalks, new landscape & irrigation, new lighting, etc.
Original Contract Time: 200 calendar days (7 months)

Completion Time: 7 months (on time)
Major Subcontractors/Suppliers: Code Electric, Prime Irrigation & Landscape, Steel Specialties, Paso Del Norte Materials.

PDN_Proof-34 (Medium)

Pedestrian Crossings Job No: 2014-246

Project Description

Client:   City of El Paso – Capital Improvements Department
Location:   Chihuahua’s Baseball Stadium
Surface Area:
Year Completed:   2014

Project consisted of a pedestrian platform extending from the ballpark site over the Bataan Railway to the South and a smaller pedestrian bridge extending from the ballpark site over the Bataan Railway to the South.

More Details

The platform and bridge both had deep foundations on the South side of the Bataan Railway.  Project scope for the platform included the following: 70’ piers, structural steel members and a metal deck with poured concrete on the Eastern 1/3rd of the platform and structural steel members with removable precast slabs on the Western 2/3rds of the platform. There are steps from Santa Fe Street up to the platform, a set of pilasters with fencing and gates in between, and a trellis. Project also included a lit signage element hanging from the trellis with a minimal amount of electrical outlets and lighting surrounding the platform. On the South side of the platform a steel fence sits on top of the brick wall. The North side of the platform tied in with the ballpark hardscape.
Original Contract Time: 200 calendar days (7 months)              
Completion Time: 7 months (on time)
Major Subcontractors/Suppliers: Vertex Contractors, Paso Del Norte Materials.
PDN_-12 (Medium)
PDN_Proof-34 (Medium)
PDN_BW-15-2 (Medium)

Santa Fe Pedestrian Improvements

PDN_-15-2 (Medium)

Project Description

Client:   City of El Paso – Capital Improvements Department
Location:   Downtown EP – Santa Fe St.
Surface Area:
Year Completed:   2015
Job No: 2015-008

Project consisted of installation/replacement of sidewalk and landscaping along Santa Fe St. between Main Dr. and San Antonio Ave.

More Details

Pedestrian facilities to be installed with this project consist of widening of the sidewalk at the northeast corner of the intersection with San Antonio, new curb and gutter, new ADA accessible curb ramps, new stamped/colored crosswalks, introduction of landscaping elements such as 3” caliper trees with grates, new irrigation system, and new street lights typical to the ones located in the downtown area.

Original Contract Time: 90 calendar days (3 months)
Completion Time: 3 months (on time)

Major Subcontractors/Suppliers: Prime Irrigation & Landscape, Code Electric, Pavement Markings Inc., Paso del Norte Materials.